
- Post-flood Rehabilitation of Rural Health and Primary Education Infrastructure, Bangladesh: Design and supervision of construction of some 300 new primary schools and repair/rehabilitation of some 100 hospitals spread all over the country.
Funding/Executing Agency: EEC/MoE & MoH, Year: 1992-96
- Food Storage Rehabilitation Project, Bangladesh: Physical inventory, design, supervision of repair/rehabilitation for upgrading Local Storage Depots at 76 different locations in the northwest of the country.
- Second Channel Studio of Bangladesh Television: Planning and detailed architectural and engineering design of the complex consisting of several studios and associated lighting, acoustics, and other service including central air-conditioning, fire fighting and security systems, etc.
- Janata Bank Head Office Building: Planning, design and supervision of construction of a 24 storied office building including air-conditioning, fire automatic detection and fighting, etc.
- National Theater: Planning and detailed architectural and engineering design of a 1400-seat auditorium including its sound and light systems, stage mechanism, air-conditioning, etc.
|