- Jamuna Bridge Project Phase-II, Bangladesh: Feasibility study, site investigation, detailed design and supervision of construction of a 4.8 km long road-rail bridge, its river training works and approach roads; EIA and resettlement plan for some 100,000 project affected persons.
Funding/Executing Agency: World Bank- ADB-OECF/JMBA, Year: 1987-98,
Project Cost: $ 700 miln.
- Second Road Rehabilitation and Maintenance Project, Bangladesh: Planning, design and supervision of construction for rehabilitation of about 165 km of primary roads, widening of 100 km roads to requisite standard, periodic maintenance of 1800 km of national highways.
- Francistown-Matsoloje Road, Botswana: Feasibility study, route selection,detailed engineering and supervision of construction of a 54 km long road in northeast.
- Savannakhet-Pakse Road, Lao PDR: Supervision of construction of a 52 km long road in Laos.
- Mongla Port Area Development Study, Bangladesh: Identification of causes preventing fuller utilization of the port's potentials; recommendations and measures for alleviating the constraints; feasibility level design of a fixed road-rail crossing 3 km long over the Rupsa to link the port to the country's network, EIA and resettlement planning.
- Fourth Railway Study, Bangladesh: Feasibility of putting railway on the 4.8 km long Jamuna Bridge, including determination of maximum railway loading configuration and route section and design of most cost effective approaches (total about 100 km) to the Bridge.
- Bangladesh Road Master Plan: Assessment of the existing 15,000 km primary road network, identification of constraints/missing links and preparation of a prioritized phases-in investment plan for improving the network. HDM-III and EBM were used.
|